D-Link DSN-2100-10 - xStack Storage Area Network Array Hard Drive Uživatelská příručka Strana 22

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 36
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 21
22 Chapter 3 Installing the DSN-2100 Storage System
3.6 Connecting the Power Cords
The DSN-2100 storage system has a two power receptacles. Both must be used to connect
the DSN-2100 to an AC outlet:
1. Plug the female end of the power cord into the 3-pronged power connectors on the back
of the DSN-2100 storage system. Plug the other end of the power cord into a working AC
outlet that is not controlled by a wall switch.
2. Repeat the previous step using the second power cable and power receptacle on the
DSN-2100 storage system. For best results, all both power receptacles should be on a
different circuit.
Although the DSN-2100 storage system can operate temporarily with only
two AC power connections, an audio alarm will sound until both power
receptacles are used.
3.7 Powering-on the DSN-2100 Storage System
To power-on the DSN-2100 storage system, press the power switch on the back panel. When
the DSN-2100 storage system powers-on, the following actions occur:
The DSN-2100 storage system Power LED turns green (see Figure 2-1).
The DSN-2100 storage system runs its power-on procedure (~4 minutes), then the
Ready/Fault LED turns green and drive LEDs may flash.
The completion of the power-on process can be verified as indicated in Table 3-2.
Table 3-2. Verifying Completion of the DSN-2100 Storage System Power-on Process
If the DSN-2100 Storage System… Verify the Power-on Process by…
Has no front panel Ready/Fault LED Wait five minutes after powering-on the DSN-2100 storage
system.
Has a front panel Ready/Fault LED. The LED turns green when the startup process completes. If
the LED turns red, reboot the DSN-2100 storage system. If the
problem persists, contact Technical Support.
Diagnostic port is connected to a PC via a diagnostic cable. The message RCP sequence complete appears on the PC
monitor. After verifying this message, disconnect the PC from
the diagnostic port.
After the DSN-2100 storage system powers-on for the first time, it automatically loads the
factory-default configuration settings. If necessary, you can use the xStack Storage
Management Center to change these settings to suit your requirements. For a description of
the array’s factory-default configuration settings and how to change them, refer to the
xStack Storage Management Center User's Guide.
Zobrazit stránku 21
1 2 ... 17 18 19 20 21 22 23 24 25 26 27 ... 35 36

Komentáře k této Příručce

Žádné komentáře

Alfa Romeo MITO manuály

Uživatelské manuály a uživatelské příručky pro Auta Alfa Romeo MITO.
Poskytujeme 1 manuály pdf Alfa Romeo MITO ke stažení zdarma podle typů dokumentů: Uživatelský manuál






Další produkty a příručky pro Auta Alfa Romeo

Modely Typ Dokumentu
159 Uživatelský manuál   Alfa Romeo 159 Owner`s manual, 338 stránky
GT Specifikace   Alfa Romeo GT Specifications, 270 stránky
33 Uživatelský manuál   Do It Yourself 4x4 switch for Alfa Romeo 33 16v Permanent 4, 38 stránky
33 Servisní příručka   Alfa Romeo 33 Technical data, 210 stránky
1750 Spider Veloce Uživatelský manuál Homologation paper list, 109 stránky